- Location: Massachusetts
- JKMuir supported Upper Blackstone Clean Water (UBCW) to develop a comprehensive, phased implementation plan for electrifying its existing vehicle fleet and installing the necessary electric vehicle (EV) charging infrastructure as a part of UBCW’s broader sustainability goals.
- JKMuir conducted a detailed evaluation of the current fleet to identify suitable EV replacements based on vehicle usage, performance requirements, and life-cycle cost analyses. In parallel, the team researched and recommended EV charging infrastructure that meets the operational needs of the facility, considering factors such as expected charging duration, the number of vehicles transitioning to electric, and site-specific constraints.
- JKMuir documented funding program requirements, confirmed UBCW’s eligibility, and provided clear guidance on application timelines, selection criteria, and steps to successfully secure financial support.
- The final deliverable included a detailed transition plan that outlined a prioritized schedule for vehicle replacement and charger installation over the next five years. This plan integrated strategic recommendations aligned with available state and federal funding opportunities and UBCW’s operational needs.ure price of energy.
